- Project Number:
- S.A.P. 054-599-065
- Contract Number:
- Other Project Numbers:
- Project Description:
- Bridge 54J33 and Approaches
- Construction Location:
- City or Township:
- Fossum
- Bid Opening:
- 06/16/2020 10:00 AM
- Expected Award Date:
- 06/25/2020
- Project Start Date:
- 06/25/2020
- Construction Start Date:
- 06/25/2020
- Construction End Date:
- 09/30/2020
- Work Type:
- Bridge
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
NOTICE FOR BIDS
S.A.P. 054-599-065
Notice is hereby given that sealed bids will be received by the Norman County Auditor at the Auditor's office in the Norman County Courthouse, 16 3rd Avenue East, Ada, MN 56510 until 10:00 a.m. on the 16th day of June, 2020 for Project S.A.P. 054-599-065.
Fossum Township Road 383 Over Marsh Creek, 0.60 Miles East of the Jct. C.S.A.H. 36.
Length of project: 0.066 Miles
Project consists of: Mobilization, 1.0 Lump Sum; Dewatering, 1.0 Lump Sum; Common Embankment (CV), 1,304.0 Cu. Yd.; Aggregate Surfacing (CV) Class 5, 156.0 Cu. Yd.; 16x12 Precast Concrete Box Culvert End Section, 4.0 Each; 16x12 Precast Concrete Box Culvert, 96.0 Lin. Ft.; Remove Existing Bridge, 1.0 Lump Sum; Structure Excavation Class U, 2,280.0 Cu. Yd.; Granular Bedding (CV), 170.0 Cu. Yd.; Geotextile Filter Type 4, 560.0 Sq. Yd.; Random Riprap Class III, 280.0 Cu. Yd.; Traffic Control, 1.0 Lump Sum; Floatation Silt Curtain Type Moving Water, 52.0 Lin. Ft.; Turf Establishment, 1.0 Lump Sum.
Prime contractors who wish to bid may download the complete set of plans and proposal documents for a fee from: QUESTCDN.com, refer to eBidDoc #7087747.