- Project Number:
- 4830002
- Contract Number:
- Other Project Numbers:
- 4830002
- Project Description:
- Chip Seal and Striping
- Construction Location:
- City or Township:
- Bid Opening:
- 04/28/2020 2:00 PM
- Expected Award Date:
- 06/01/2020
- Project Start Date:
- 06/01/2020
- Construction Start Date:
- 06/01/2020
- Construction End Date:
- 09/26/2020
- Work Type:
- Surfacing
- Project Type:
- Road and Street
- Highest Funding Level:
- Local
- DBE Project:
- No
Chip Seal and Striping on Various Hennepin County Roadways
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.601 | MOBILIZATION AREA 1 | LUMP SUM | 1.00 |
2021.601 | MOBILIZATION AREA 2 | LUMP SUM | 1.00 |
2021.601 | MOBILIZATION AREA 3 | LUMP SUM | 1.00 |
2021.601 | MOBILIZATION AREA 4 | LUMP SUM | 1.00 |
2102.503 | PAVEMENT MARKING REMOVAL | LIN FT | 200.00 |
2102.518 | PAVEMENT MARKING REMOVAL | SQ FT | 2,973.00 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GALLON | 45,303.00 |
2356.504 | BITUMINOUS SEAL COAT | SQ YD | 453,040.00 |
2356.506 | BITUMINOUS MATERIAL FOR SEAL COAT | GALLON | 117,789.00 |
2563.601 | TRAFFIC CONTROL AREA 1 | LUMP SUM | 1.00 |
2563.601 | TRAFFIC CONTROL AREA 2 | LUMP SUM | 1.00 |
2563.601 | TRAFFIC CONTROL AREA 3 | LUMP SUM | 1.00 |
2563.601 | TRAFFIC CONTROL AREA 4 | LUMP SUM | 1.00 |
2563.601 | TRAFFIC CONTROL SUPERVISOR 1 | LUMP SUM | 1.00 |
2563.613 | PORTABLE CHANGEABLE MESSAGE SIGN | UNIT DAY | 64.00 |
2573.502 | STORM DRAIN INLET PROTECTION | EACH | 1,022.00 |
2582.503 | 24" SOLID LINE PAINT | LIN FT | 458.00 |
2582.503 | 4" BROKEN LINE PAINT | LIN FT | 62,124.00 |
2582.503 | 4" DBLE SOLID LINE PAINT | LIN FT | 7,930.00 |
2582.503 | 4" DOTTED LINE PAINT | LIN FT | 6,051.00 |
2582.503 | 4" SOLID LINE PAINT | LIN FT | 107,232.00 |
2582.503 | 6" SOLID LINE PAINT | LIN FT | 16,224.00 |
2582.518 | CROSSWALK PAINT | SQ FT | 9,072.00 |
2582.518 | PAVT MSSG PAINT | SQ FT | 4,920.00 |