Minnesota County Engineers Association City Engineers Association of Minnesota Minnesota Department of Transportation
Home | Advanced Search | FAQ | Bid Calendar | Privacy Policy |
rss feed icon rss feed icon

Project Number:
SAP 040-633-007, SAP 040-633-008, CP 1131, CP 2104
Contract Number:
Other Project Numbers:
CP 1131, CP 2104, SAP 040-633-007,008
Project Description:
Full Depth Reclamation, Bituminous Overlay, Box Culvert, Aggregate Shouldering, and Seeding
Construction Location:
Various Locations
City or Township:
Bid Opening:
04/10/2020 1:00 PM
Expected Award Date:
04/21/2020
Project Start Date:
06/01/2020
Construction Start Date:
06/01/2020
Construction End Date:
10/02/2020
Work Type:
Bituminous
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
NOTICE: To mitigate the spread of COVID-19 (coronavirus), our door will be closed to the public. Please call to make arrangements to obtain the plans and proposal material.

NOTICE

NOTICE TO CONTRACTORS - Sealed bids will be received until 1:00 p.m., Friday, April 10th, 2020 by Darrell Pettis, County Administrator of Le Sueur County, 88 South Park Avenue, Le Center, Minnesota on behalf of the County Board of Commissioners for the Full Depth Reclamation, Bituminous Overlay, Box Culvert, Aggregate Shouldering, and Seeding Project on CSAH 33, CR 104, CR 131; SAP 040-633-007, SAP 040-633-008, CP 1131, & CP 2104. Total Project Length of 7.307 miles.

The approximate major quantities are as follows:
Class 1,2 Aggregate Shouldering 7650 Tons
Class 5 Aggregate Base 19786 Tons
2360 Plant Mixed Bituminous 24800 Tons
Traffic Control 4 Lump Sum
4" Solid & Broken Line Traffic Paint 452 Gallons
4" Perf. PE Edge Drain 42258 Linear Feet
Full Depth Reclamation 136164 Sq. Yd.
10x8 Precast Concrete Box Culvert 200 Linear Feet
Turf Establishment 4 Lump Sum

Proposals, plans, and specifications may be examined and obtained at the County Highway Engineer's Office, 88 South Park Avenue, Le Center, Minnesota 56057, telephone 507-357-8210. The price of plans is $25.00. A certified check or a corporate surety bond, made payable to the Treasurer of Le Sueur County, must accompany bids in an amount of not less than five percent (5%) of total bid.

The County Board reserves the right to reject any or all bids and to waive any defects therein.

Darrell Pettis
County Administrator
Le Sueur County, Minnesota

Please publish for three (3) consecutive weeks as a legal ad, starting with the week of your March 18th, 2020 publication.

Billing Address: Le Sueur County Highway Department
88 South Park Avenue
Le Center, MN 56057
Attn: Colleen Baker
507-357-8210

Please provide our office with an affidavit of publication.
Project Major Items:
NumberItemUnitsQuantity
2211.509Class 1,2 Aggregate ShoulderingTons7,650.00
2211.509Class 5 Aggregate BaseTons19,786.00
2215.504Full Depth ReclamaionSq Yd136,164.00
2360.5092360 Plant Mix BituminousTons24,800.00
2412.50310x8 Precast Concrete Box CulvertLin Ft200.00
2502.5034" Perf. PE Pipe DrainLin Ft42,258.00
2563.601Traffic ControlLump Sum4.00
2575.501Turf EstablishmentLump Sum4.00
2582.5064" Solid & Broken Line Traffic PaintGallons452.00
Project Owner:

David Tiegs
88 South Park Ave
Le Center, MN   56057
(507) 357-8200
dtiegs@co.le-sueur.mn.us
Project Engineer:

Nathan Olson
88 South Park Ave
Le Center, MN   56057
(507) 357-8211
nolson@co.le-sueur.mn.us