- Project Number:
- SAP 069-737-004
- Contract Number:
- 465279
- Other Project Numbers:
- CP 0137-465279 SAP 069-737-004
- Project Description:
- CP 0137-465279 (Low), SAP 069-737-004 - Culvert Replacement
- Construction Location:
- City or Township:
- Bid Opening:
- 04/02/2020 10:00 AM
- Expected Award Date:
- 04/28/2020
- Project Start Date:
- 08/24/2020
- Construction Start Date:
- 08/24/2020
- Construction End Date:
- 10/03/2020
- Work Type:
- Pipe and Culvert
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
CP 0137-465279, SAP 069-737-004 (Low); CP 0708-526988 (Tied) - Culvert Replacement, Aggregate Base, and Plant Mixed Bituminous Patches
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2104.503 | REMOVE PIPE CULVERTS | LIN FT | 763.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 966.00 |
2105.504 | GEOTEXTILE FABRIC TYPE 6 | SQ YD | 4,253.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 17.00 |
2123.510 | MOTOR GRADER | HOUR | 17.00 |
2130.523 | WATER | M GALLON | 17.00 |
2211.507 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 953.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2;C) | TON | 524.00 |
2411.507 | GRANULAR BACKFILL (CV) | CU YD | 3,040.00 |
2451.507 | GRANULAR BEDDING (CV) | CU YD | 235.00 |
2451.507 | STRUCTURE EXCAVATION CLASS E | CU YD | 4,666.00 |
2501.502 | 24" CAS PIPE APRON | EACH | 34.00 |
2501.503 | 24" CAS PIPE CULVERT | LIN FT | 786.00 |
2511.507 | RANDOM RIPRAP CLASS II | CU YD | 6.40 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2563.601 | WORK ZONE SPEED LIMIT | LUMP SUM | 1.00 |
2573.501 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2573.502 | CULVERT END CONTROLS | EACH | 17.00 |
2573.503 | SEDIMENT CONTROL LOG TYPE STRAW | LIN FT | 2,350.00 |
2575.504 | RAPID STABILIZATION METHOD 4 | SQ YD | 3,170.00 |