Number | Item | Units | Quantity |
---|
2016.601 | QUALITY MANAGEMENT | LUMP SUM | 1.00 |
2016.601 | QUALITY MANAGEMENT SPECIAL | LUMP SUM | 1.00 |
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2021.601 | RAILROAD PROTECTIVE SERVICES | LUMP SUM | 1.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 483.00 |
2104.504 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 1,073.00 |
2104.618 | REMOVE STONE PAVERS | SQ FT | 214.00 |
2118.609 | RECYCLED AGGREGATE SURFACING | TON | 1,975.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 13.00 |
2123.510 | 8 TON STEEL-WHEELED ROLLER | HOUR | 48.00 |
2123.510 | MOTOR GRADER | HOUR | 48.00 |
2130.523 | WATER | M GALLON | 161.00 |
2131.506 | CALCIUM CHLORIDE SOLUTION | GALLON | 9,311.00 |
2211.509 | AGGREGATE BASE CLASS 5 | TON | 1,699.00 |
2215.504 | FULL DEPTH RECLAMATION | SQ YD | 49,567.00 |
2215.604 | BASE STABILIZATION (BASE ONE) | SQ YD | 49,567.00 |
2221.509 | SHOULDER BASE AGGREGATE CLASS 5 | TON | 1,003.00 |
2232.504 | MILL BITUMINOUS SURFACE (2.0") | SQ YD | 51,762.00 |
2357.506 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 2,247.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIX (2;C) | TON | 5,014.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2;C) | TON | 5,705.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 31.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2580.503 | INTERIM PAVEMENT MARKING | LIN FT | 12,760.00 |
2582.503 | 24" SOLID LINE PREF TAPE GR IN | LIN FT | 124.00 |
2582.503 | 4" BROKEN LINE MULTI COMP | LIN FT | 2,520.00 |
2582.503 | 4" DBLE SOLID LINE MULTI COMP | LIN FT | 1,500.00 |
2582.503 | 4" SOLID LINE MULTI COMP | LIN FT | 7,240.00 |
2582.503 | 6" SOLID LINE MULTI COMP | LIN FT | 28,744.00 |
2582.518 | PAVT MSSG PREF TAPE GR IN | SQ FT | 123.44 |