Number | Item | Units | Quantity |
---|
2016.601 | QUALITY MANAGEMENT | LUMP SUM | 1.00 |
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 214.00 |
2104.504 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 3,156.00 |
2105.604 | GEOGRID | SQ YD | 2,167.00 |
2118.609 | RECYCLED AGGREGATE SURFACING | TON | 1,763.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 10.00 |
2123.510 | 8 TON STEEL-WHEELED ROLLER | HOUR | 34.00 |
2123.510 | MOTOR GRADER | HOUR | 34.00 |
2130.523 | WATER | M GALLON | 114.00 |
2131.506 | CALCIUM CHLORIDE SOLUTION | GALLON | 6,556.00 |
2211.509 | AGGREGATE BASE CLASS 5 | TON | 1,942.00 |
2215.504 | FULL DEPTH RECLAMATION | SQ YD | 33,450.00 |
2215.604 | BASE STABILIZATION (BASE ONE) | SQ YD | 33,450.00 |
2357.506 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 1,892.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIX (2;C) | TON | 4,363.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2;C) | TON | 3,127.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 21.00 |
2554.603 | RAISE GUARDRAIL | LIN FT | 579.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2580.503 | INTERIM PAVEMENT MARKING | LIN FT | 20,070.00 |
2582.503 | 4" DBLE SOLID LINE MULTI COMP | LIN FT | 10,035.00 |
2582.503 | 4" SOLID LINE MULTI COMP | LIN FT | 19,892.00 |
2582.518 | PAVT MSSG PREF TAPE GR IN | SQ FT | 49.02 |