Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 0.26 |
2021.501 | MOBILIZATION | LUMP SUM | 0.74 |
2031.502 | FIELD OFFICE TYPE D | EACH | 1.00 |
2101.501 | CLEARING & GRUBBING | LUMP SUM | 1.00 |
2104.503 | REMOVE PIPE CULVERTS | LIN FT | 166.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 48.00 |
2104.504 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 1,662.00 |
2105.504 | GEOTEXTILE FABRIC TYPE 6 | SQ YD | 570.00 |
2105.601 | DEWATERING | LUMP SUM | 1.00 |
2105.601 | ONE LANE BYPASS (14' LANE) | LUMP SUM | 1.00 |
2105.601 | TEMPORARY STREAM DIVERSION SYSTEM | LUMP SUM | 1.00 |
2106.507 | EXCAVATION - COMMON | CU YD | 3,330.00 |
2106.507 | GRANULAR EMBANKMENT (CV) | CU YD | 391.00 |
2106.507 | SELECT GRANULAR EMBANKMENT (CV) | CU YD | 16.00 |
2106.507 | SELECT GRANULAR EMBANKMENT (CV) | CU YD | 517.00 |
2106.507 | SELECT GRANULAR EMBANKMENT MOD 7% (CV) | CU YD | 2,290.00 |
2211.507 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 709.00 |
2357.606 | BITUMINOUS MATERIAL FOR SHOULDER TACK | GALLON | 101.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIX (3;C) | TON | 531.00 |
2412.502 | 14X7 PRECAST CONCRETE BOX CULV END SECT | EACH | 2.00 |
2412.503 | 14X7 PRECAST CONCRETE BOX CULVERT | LIN FT | 56.00 |
2451.507 | COARSE AGGREGATE BEDDING (CV) | CU YD | 133.00 |
2501.502 | 24" SPAN GS PIPE-ARCH APRON | EACH | 2.00 |
2501.502 | INSTALL CULVERT MARKER | EACH | 4.00 |
2501.503 | 24" SPAN CS PIPE-ARCH CULVERT | LIN FT | 30.00 |
2501.507 | CULVERT EXCAVATION CLASS U | CU YD | 20.00 |
2501.507 | CULVERT EXCAVATION CLASS U | CU YD | 876.00 |
2511.507 | RANDOM RIPRAP CLASS II | CU YD | 75.00 |
2511.507 | RANDOM RIPRAP CLASS III | CU YD | 34.00 |
2511.602 | PLACE BOULDER | EACH | 6.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 0.26 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 0.74 |
2573.501 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2573.503 | SILT FENCE; TYPE HI | LIN FT | 769.00 |
2573.602 | ROCK DITCH CHECK | EACH | 9.00 |
2574.507 | COMMON TOPSOIL BORROW | CU YD | 360.00 |
2574.508 | FERTILIZER TYPE 3 | POUND | 315.00 |
2575.504 | EROSION CONTROL BLANKETS CATEGORY 3N | SQ YD | 3,666.00 |
2575.504 | EROSION CONTROL BLANKETS CATEGORY 4N | SQ YD | 690.00 |
2575.505 | SEEDING | ACRE | 0.90 |
2575.508 | SEED MIXTURE 25-141 | POUND | 54.00 |
2575.523 | RAPID STABILIZATION METHOD 3 | M GALLON | 10.80 |
2580.503 | INTERIM PAVEMENT MARKING | LIN FT | 600.00 |
2582.503 | 4" DBLE SOLID LINE PAINT | LIN FT | 600.00 |
2582.503 | 4" SOLID LINE PAINT | LIN FT | 1,200.00 |