Project Number:
2183305
Contract Number:
Other Project Numbers:
Project Description:
Ford Parkway Drainage Improvements and Slope Stabilization
Construction Location:
Bank of Mississippi River
City or Township:
Minneapolis
Bid Opening:
07/09/2019 2:00 PM
Expected Award Date:
08/30/2019
Project Start Date:
08/30/2019
Construction Start Date:
09/03/2019
Construction End Date:
11/27/2019
Work Type:
Reconstruct
Project Type:
Drainage
Highest Funding Level:
Local
DBE Project:
No
This project entails drainage improvements and slope stabilization near the Ford Parkway Avenue Bridge near the Mississippi river.
Project Major Items:
NumberItemUnitsQuantity
2021.501MOBILIZATIONLUMP SUM1.00
2101.501CLEARING & GRUBBINGLUMP SUM1.00
2104.502REMOVE CONCRETE SLABEACH1.00
2104.502REMOVE DRAINAGE STRUCTUREEACH1.00
2104.502REMOVE SURGE BASINEACH1.00
2104.503REMOVE CHAIN LINK FENCELIN FT40.00
2104.503REMOVE SEWER PIPE (STORM)LIN FT65.00
2105.504GEOTEXTILE FABRIC TYPE 8SQ YD17.00
2106.507COMMON EMBANKMENT (CV)CU YD50.00
2106.507EXCAVATION - COMMONCU YD15.00
2123.610STREET SWEEPER (WITH PICKUP BROOM)HOUR16.00
2411.604REINFORCED SOIL SLOPE SPECIALSQ YD556.00
2411.604SHOTCRETESQ YD5.00
2433.603ROCK ANCHORAGES TYPE 2LIN FT60.00
2451.507FINE AGGREGATE BEDDING (CV)CU YD24.00
2451.507STRUCTURE EXCAVATION CLASS RCU YD10.00
2501.50218" GS PIPE APRONEACH1.00
2501.502A-S DIAPHRAGM FOR 18" CP PIPEEACH2.00
2503.50318" CP PIPE SEWERLIN FT68.00
2503.602CONNECT TO EXISTING STORM SEWEREACH1.00
2503.603CLEAN PIPE SEWERLIN FT70.00
2503.603LINING SEWER PIPE 18"LIN FT70.00
2506.502CASTING ASSEMBLYEACH1.00
2506.502CONST DRAINAGE STRUCTURE DESIGN SPECIALEACH1.00
2511.504GEOTEXTILE FILTER TYPE 3SQ YD47.00
2511.507RANDOM RIPRAP CLASS IICU YD1.00
2512.507GABIONCU YD7.00
2512.507REVET MATTRESSCU YD6.00
2515.504ARTICULATED BLOCK MAT OPEN CELL TYPE ASQ YD37.00
2554.602GUIDE POST TYPE SPECIALEACH1.00
2557.602VEHICULAR GATE SPECIALEACH2.00
2563.601ALTERNATE PEDESTRIAN ROUTELUMP SUM1.00
2564.602INSTALL STEEL POSTEACH1.00
2573.501STABILIZED CONSTRUCTION EXITLUMP SUM1.00
2573.502STORM DRAIN INLET PROTECTIONEACH2.00
2573.503SEDIMENT CONTROL LOG TYPE COMPOSTLIN FT180.00
2573.503SILT FENCE; TYPE HILIN FT222.00
2574.505SOIL BED PREPARATIONACRE0.10
2574.505SUBSOILINGACRE0.10
2574.507SANDY CLAY LOAM TOPSOIL BORROWCU YD3.00
2574.508FERTILIZER TYPE 4POUND14.00
2575.504TURF REINFORCEMENT MAT CATEGORY 4SQ YD157.00
2575.505SEEDINGACRE0.10
2575.508SEED MIXTURE 35-221POUND3.00
Project Owner:

Ulstad, Luke
1600 Prairie Drive
Medina, MN   55340
(612) 596-0380
luke.ulstad@hennepin.us
Project Engineer:

Ulstad, Luke
1600 Prairie Drive
Medina, MN   55340
(612) 596-0380
luke.ulstad@hennepin.us