Project Number:
CR 41 RECONSTRUCTION
Contract Number:
Winona County
Other Project Numbers:
CP 1614 SAP 085-641-002
Project Description:
ROADWAY RECONSTRUCTION

Including Bituminous Milling & Full Depth Reclamation, Grading & Aggregate Base, Bituminous Paving, Miscellaneous Removals, F&I Culverts & Aprons, Random Riprap, Traffic Control, Turf Establishment and Striping
Construction Location:
CR 41 from W county line to north county line
City or Township:
Near Plainview
Bid Opening:
05/09/2019 10:00 AM
Expected Award Date:
05/28/2019
Project Start Date:
06/03/2019
Construction Start Date:
06/03/2019
Construction End Date:
07/31/2020
Work Type:
Reconstruct
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
ESTIMATED QUANTITIES OF WORK
Mobilization - 1 LS
Clearing - 0.7 Acres
Grubbing - 0.7 Acres
Clearing - 21 Trees
Grubbing - 21 Trees
Salvage Mailbox Support - 12 Each
Sawing Bituminous Pavement (Full Depth) - 66 LF
Remove Culverts & Cattle Passes - 1,817 LF
Remove Fence - 8,285 LF
Remove Bituminous Driveway Pavement - 91 SY
Common Excavation - 41,203 CY
Select Granular Borrow (CV) - 23 CY
Aggregate Shoulder, Base Class 2 & Class 2 Modified - 24,084 CY
Full Depth Bituminous Pavement Reclamation - 39,416 SY
Mill Bituminous Surface - 39,416 SY
Bituminous Material for Tack Coat - 2,500 Gallons
Type SP 12.5 Wearing Course Mix (2,C) - 12,433 Ton
Pavement Density Incentive - 1 LS
Pavement Smoothness Incentive - 58 Seg
Granular Backfill & Granular Backfill (Mod) - 1,541 CY
Granular Foundation and/or Bedding - 761 CY
CS Pipe Apron 18"-30" - 58 Each
RC Pipe Apron 18" & 24" - 31 Each
CS Pipe Culvert 18"-30" - 1,663 LF
RC Pipe Culvert 18"-24" - 1,352 LF
Construct Control Structure - 1 Each
Random Riprap Class III - 247 CY
Install Mailbox Support - 12 Each
Traffic Control - 1 LS
Culvert End Controls - 88 Each
Silt Fence Type MS - 8,378 LF
Flotation Silt Curtain Type Still Water - 180 LF
Sediment Control Log Type Compost - 5,086 LF
Temporary Sediment Trap - 3 Each
Soil Bed Preparation - 27.91 Acres
Fertilizer Type 3 - 9,988 LB
Erosion Control Blanket Cat 3N & 4N - 61,075 SY
Seeding - 27.91 Acres
Rapid Stabilization Method 1 - 18.42 Acres
Seed Mixtures 25-141, 25-151 & 33-261 - 1,748 LB
Hydraulic Bonded Fiber Matrix - 56,008 LB
Roadway Striping - 44,968 LF
and Miscellaneous and Appurtenant Items required for a Complete Project
Project Owner:

Winona County Highway Department
5300 Highway 61 West
Winona, MN   55987
(507) 457-8840
(507) 454-3699
bspalding@co.winona.mn.us
Project Engineer:

Winona County Highway Department
5300 Highway 61 West
Winona, MN   55987
(507) 457-8840
(507) 454-3699
bspalding@co.winona.mn.us