- Project Number:
- SAP 017-599-106
- Contract Number:
- 201906
- Other Project Numbers:
- SAP 017-599-106
- Project Description:
- Bridge Replacement
- Construction Location:
- City or Township:
- Bid Opening:
- 05/06/2019 1:00 PM
- Expected Award Date:
- 05/07/2019
- Project Start Date:
- 06/10/2019
- Construction Start Date:
- 06/10/2019
- Construction End Date:
- 11/15/2019
- Work Type:
- Bridge
- Project Type:
- Bridges
- Highest Funding Level:
- State
- DBE Project:
- No
See County eGram for further details.
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LS | 1.00 |
2104.503 | REMOVE PIPE CULVERTS | L F | 372.00 |
2106.507 | EXCAVATION - COMMON | C Y | 232.00 |
2411.507 | STRUCTURE EXCAVATION CLASS U | C Y | 1,476.00 |
2412.502 | 14X8 PRECAST CONCRETE BOX CULV END SECT | EACH | 4.00 |
2412.503 | 14X8 PRECAST CONCRETE BOX CULVERT | L F | 112.00 |
2451.609 | 1 1/2" CRUSHED ROCK BEDDING | TON | 309.00 |
2501.502 | 18" GS PIPE APRON | EACH | 4.00 |
2501.502 | 24" GS PIPE APRON | EACH | 2.00 |
2501.503 | 18" CS PIPE CULVERT | L F | 120.00 |
2501.503 | 24" CS PIPE CULVERT | L F | 60.00 |
2511.509 | RANDOM RIPRAP CLASS III | TON | 100.00 |
2575.504 | RAPID STABILIZATION METHOD 4 | S Y | 3,000.00 |