Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2101.524 | CLEARING | TREE | 1.00 |
2101.524 | GRUBBING | TREE | 1.00 |
2104.503 | REMOVE PIPE CULVERTS | LIN FT | 48.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 48.00 |
2104.504 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 72.00 |
2105.602 | TEMPORARY STREAM DIVERSION SYSTEM | EACH | 1.00 |
2118.509 | AGGREGATE SURFACING CLASS 5 | TON | 5.00 |
2211.507 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 26.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2;B) | TON | 17.00 |
2401.507 | STRUCTURE EXCAVATION CLASS E | CU YD | 250.00 |
2451.507 | GRANULAR BEDDING (CV) | CU YD | 120.00 |
2501.502 | 36" RC PIPE APRON | EACH | 2.00 |
2501.503 | 36" RC PIPE CULVERT DES 3006 | LIN FT | 48.00 |
2511.507 | RANDOM RIPRAP CLASS III | CU YD | 19.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2573.501 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2573.503 | SEDIMENT CONTROL LOG TYPE STRAW | LIN FT | 60.00 |
2575.504 | RAPID STABILIZATION METHOD 4 | SQ YD | 87.00 |
2582.503 | 4" DBLE SOLID LINE PAINT | LIN FT | 27.00 |
2582.503 | 6" SOLID LINE PAINT | LIN FT | 54.00 |