Project Number:
078-605-007
Contract Number:
Other Project Numbers:
078-605-007
Project Description:
Stabilized Full Depth Reclamation, Bituminous Surfacing, Aggregate Shoulders (Modified), Seal Coat on CSAH #5, from CSAH #4 to CSAH #6
Construction Location:
On CSAH #5, from CSAH #4 to CSAH #6
City or Township:
Wheaton
Bid Opening:
05/10/2019 11:00 AM
Expected Award Date:
05/21/2019
Project Start Date:
06/10/2019
Construction Start Date:
06/10/2019
Construction End Date:
08/30/2019
Work Type:
Bituminous
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
NOTICE TO CONTRACTORS
BIDS CLOSE May 10, 2019
WHEATON, MINNESOTA

Notice is hereby given that sealed bids will be received by the Traverse County Engineer at the Office of the Highway Department, 708 3rd Ave. No. (mailing address, P.O. Box 485) Wheaton, Minnesota 56296, telephone (320) 563-4848, until 11:00 AM on May 10, 2019 for the following:

Project No: S.A.P. 078-605-007

Location: On CSAH #5, from CSAH #4 to CSAH #6

Type of Work: Stabilized Full Depth Reclamation, Bituminous Surfacing, Aggregate Shoulders (Modified), Seal Coat

Specifications and plans may be examined and secured at the Office of the County Highway Engineer, 708 3rd Ave. No. (mailing address, PO Box 485), Wheaton, MN 56296, telephone (320) 563-4848. Requests for plans, proposal, and specifications must be accompanied by a check, draft or money order for $40.00 per set (non refundable) made payable to the Traverse County Treasurer.

The right is reserved to reject any or all bids or parts of bids and waive informalities herein.

All bids must be accompanied by a certified check, cashiers check, or bidders bond, payable to the Traverse County Treasurer for at least 5% of the proposal, said check or bond to be forfeited to the County if an award is made to a bidder and he fails to execute a contract covering the same. No bidder may withdraw his bid (which includes a certified check, cashiers check or bidders bond) within 15 days after the scheduled closing of the receipt of bids.

Bids will be opened at the Office of the Highway Department, 708 3rd Ave. No., Wheaton, MN 56296 at 11:00 AM on May 10, 2019.

Dated at Wheaton, Minnesota, this 2nd day of April, 2019.

Kit Johnson
County Auditor/Treasurer
Traverse County, Minnesota

(Publish April 9, April 16, and April 23, 2019)
Project Major Items:
NumberItemUnitsQuantity
2118.509Aggregate Surfacing, Class 1 (Modified)Ton6,075.00
2215.504Stabilized Full Depth Reclamation (12")Sq Yd1,920.00
2215.504Stabilized Full Depth Reclamation (8")Sq Yd82,905.00
2232.504Mill Bituminous Surface (1 1/2")Sq Yd74,080.00
2356.506Bituminous Material for Seal CoatGal26,468.00
2356.509Seal Coat Aggregate (FA-2 Modified)Ton945.00
2357.506Bituminous Material for Tack CoatGal3,855.00
2360.509Type SP 9.5 Non-Wearing Course Mixture (3,C)Ton8,740.00
2360.509Type SP 9.5 Wearing Course Mixture (3,C)Ton8,740.00
2582.5034" Broken Line Yellow-PaintLin Ft5,280.00
2582.5034" Solid Line Yellow-PaintLin Ft1,000.00
2582.5036" Solid Line White-PaintLin Ft52,410.00
Project Owner:

Traverse County Highway Department
708 3rd Ave N
PO Box 485
Wheaton, MN   56296
(320) 563-4848
(320) 563-8734
Chad.Gillespie@co.traverse.mn.us
janelle.tritz@co.traverse.mn.us
Project Engineer:

Traverse County Highway Department
708 3rd Ave N
PO Box 485
Wheaton, MN   56296
(320) 563-4848
(320) 563-8734
Chad.Gillespie@co.traverse.mn.us
janelle.tritz@co.traverse.mn.us