Project Number:
CR 25 & Fairwater Road Box Culvert Replacements
Contract Number:
Winona County
Other Project Numbers:
CPs 1310 & 1407 085-599-077&625-065
Project Description:
CR 25 Box Culvert & Fairwater Rd Box Culvert Replacements

REMOVE BRIDGES & BOX CULVERT REPLACEMENTS
Surfacing, Clearing & Grubbing, Misc Removals, RC Box Culverts & Aprons, Random Riprap, CS Culvert, Traffic Control, Erosion Control, Turf & striping
Construction Location:
Fairwater Rd @ 2.4 Miles NW of TH 74
CR 25 @ 0.50 Miles N of CR 114
City or Township:
Elba & Mt Vernon
Bid Opening:
04/04/2019 10:00 AM
Expected Award Date:
04/23/2019
Project Start Date:
05/01/2019
Construction Start Date:
05/01/2019
Construction End Date:
10/25/2019
Work Type:
Pipe and Culvert
Project Type:
Bridges
Highest Funding Level:
State
DBE Project:
No
CR 25 Box Culvert
Mobilization - 1 LS
Clearing and Grubbing - 1 LS
Sawing Bituminous Pavement (Full Depth) - 66 LF
Remove Bituminous Pavement - 561 SY
3 CY Shovel - 8 Hours
Dozer - 8 Hours
Aggregate Base Class 2 & Class 2 Modified - 609 TON
Shoulder Base Aggregate Class 2 - 34 TON
Type SP 12.5 Wearing Course Mixture (2,C) - 165 Tons
16'x5' Precast Concrete Box Culvert - 144 LF
16'x5' Precast Concrete Box Culvert End Section - 4 Each
Remove Existing Bridge - 1 LS
Structural Excavation Class U (P) - 3,589 CY
Granular Backfill (CV) - 5,433 TON
Course Filter Aggregate (CV) - 523 CY
Random Riprap Class IV - 145 CY
Lean Mix Backfill - 14 CY
Traffic Control - 1 LS
Silt Fence, Type Machine Sliced - 307 LF
Fertilizer Type 3 - 40 Lbs
Erosion Control Blanket, Category 3 - 987 SY
Seed Mixture 25-121 - 15 Lbs
Rapid Stabilization Method 3 - 5 MGal
Seeding - 0.2 Acres
4" Solid Line Paint - 370 LF
and Miscellaneous and Appurtenant Items required for a Complete Project.

Fairwater Road Box Culvert
Mobilization - 1 LS
Clearing and Grubbing - 1 LS
Unclassified Excavation - 1,136 CY
Aggregate Surfacing Class 2 - 383 TON
Aggregate Base Class 2 Modified - 594 TON
12'x4' Precast Concrete Box Culvert End Section - 2 Each
12'x4' Precast Concrete Box Culvert - 36 LF
Remove Existing Bridge - 1 LS
Course Filter Aggregate - 122 CY
Granular Backfill - 721 TON
21" Span GS Pipe-Arch Apron - 2 Each
21" Span CS Pipe-Arch Culvert - 30 LF
Random Riprap Class IV - 185 CY
Traffic Control - 1 LS
Silt Fence, Type Machine Sliced - 380 LF
Sediment Control Log Type Wood Fiber - 48 LF
Fertilizer Type 3 - 140 Lbs
Erosion Control Blanket, Category 3N - 2,310 SY
Seeding - 0.4 Acres
Seed Mixture 25-141 - 30 Lbs
and Miscellaneous and Appurtenant Items required for a Complete Project.
Project Owner:

Winona County Highway Department
5300 Highway 61 West
Winona, MN   55987
(507) 457-8840
(507) 454-3699
bspalding@co.winona.mn.us
Project Engineer:

Troy Drath, PE
Winona County Highway Department
5300 Highway 61 West
Winona, MN   55987
(507) 457-8840
(507) 454-3699
tdrath@co.winona.mn.us