Minnesota County Engineers Association City Engineers Association of Minnesota Minnesota Department of Transportation
Home | Advanced Search | FAQ | Bid Calendar | Privacy Policy |
rss feed icon rss feed icon

Project Number:
SAP 051-608-015
Contract Number:
20192
Other Project Numbers:
SAP 051-608-015
Project Description:
2019 Mill and Bit. Overlay Projects with ADA Ramps
Construction Location:
CSAH 8, CSAH 25, CSAH 27, CSAH 52
City or Township:
Bid Opening:
04/16/2019 10:30 AM
Expected Award Date:
04/16/2019
Project Start Date:
04/16/2019
Construction Start Date:
05/01/2019
Construction End Date:
08/17/2019
Work Type:
Mill and Overlay
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
To download the plan and proposal please go to the Murray County Website by clicking on the full ad link below or copy and paste the following address to your browser.
http://hwy.murray-countymn.com/he/projects.asp
Project Major Items:
NumberItemUnitsQuantity
2104.503REMOVE CURB & GUTTERL F379.00
2104.503REMOVE CURB & GUTTERL F556.00
2104.503REMOVE CURB & GUTTERL F2,205.00
2104.518REMOVE CONCRETE SIDEWALKS F2,526.00
2104.518REMOVE CONCRETE SIDEWALKS F2,800.00
2104.518REMOVE CONCRETE SIDEWALKS F8,265.00
2118.509AGGREGATE SURFACING CLASS 1TON1,500.00
2232.504MILL BITUMINOUS SURFACE (2.0")S Y278.00
2232.504MILL BITUMINOUS SURFACE (2.0")S Y9,625.00
2232.504MILL BITUMINOUS SURFACE (2.0")S Y11,971.00
2232.504MILL BITUMINOUS SURFACE (2.0")S Y18,070.00
2360.509TYPE SP 12.5 BIT MIXTURE FOR PATCHINGTON120.00
2360.509TYPE SP 12.5 BIT MIXTURE FOR PATCHINGTON1,245.00
2360.509TYPE SP 12.5 BIT MIXTURE FOR PATCHINGTON2,000.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;B)TON1,245.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;B)TON1,350.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;B)TON1,990.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;B)TON6,700.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;B)TON9,610.00
2521.5184" CONCRETE WALKS F3,929.00
2521.6186" CONCRETE WALK (ADA)S F2,528.00
2521.6186" CONCRETE WALK (ADA)S F2,818.00
2521.6186" CONCRETE WALK (ADA)S F6,921.00
2531.503CONCRETE CURB & GUTTER DESIGN B618L F497.00
2531.603CONCRETE CURB & GUTTER B618 (ADA)L F1,702.00
2531.603CONCRETE CURB & GUTTER B624 (ADA)L F385.00
2531.603CONCRETE CURB & GUTTER B624 (ADA)L F556.00
2531.618TRUNCATED DOMESS F162.00
2531.618TRUNCATED DOMESS F178.00
2531.618TRUNCATED DOMESS F618.00
2575.602SITE RESTORATIONEACH7.00
2575.602SITE RESTORATIONEACH10.00
2575.602SITE RESTORATIONEACH33.00
2582.50324" SOLID LINE PAINTL F29.00
2582.5034" BROKEN LINE PAINTL F2,680.00
2582.5034" SOLID LINE PAINTL F49,692.00
2582.518PAVT MSSG PAINTS F49.00
Project Owner:

Murray County Hwy Dept
3051 20th Street
Slayton, MN   56172
(507) 836-6327
(507) 836-8891
mchd@co.murray.mn.us
Project Engineer:

Groves, Randy
3051 20th Street
Slayton, MN   56172
(507) 836-6327
(507) 836-8891
rgroves@co.murray.mn.us