Number | Item | Units | Quantity |
---|
2016.601 | QUALITY MANAGEMENT | LUMP SUM | 1.00 |
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 184.00 |
2104.504 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 1,569.00 |
2105.504 | GEOTEXTILE FABRIC TYPE 6 | SQ YD | 1,956.00 |
2106.507 | EXCAVATION - COMMON | CU YD | 1,160.00 |
2106.507 | SELECT GRANULAR EMBANKMENT MOD 7% (CV) | CU YD | 229.00 |
2118.509 | AGGREGATE SURFACING CLASS 5 | TON | 1,709.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 13.00 |
2123.510 | 8 TON STEEL-WHEELED ROLLER | HOUR | 45.00 |
2123.510 | MOTOR GRADER | HOUR | 45.00 |
2130.523 | WATER | M GALLON | 150.00 |
2131.506 | CALCIUM CHLORIDE SOLUTION | GALLON | 7,699.00 |
2211.507 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 1,095.00 |
2211.509 | AGGREGATE BASE CLASS 5 | TON | 1,338.00 |
2211.604 | AGGREGATE BASE STABILIZATION | SQ YD | 41,455.00 |
2215.504 | FULL DEPTH RECLAMATION | SQ YD | 34,360.00 |
2232.504 | MILL BITUMINOUS SURFACE (1.0") | SQ YD | 31,497.00 |
2357.506 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 1,989.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIX (2;C) | TON | 4,242.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2;C) | TON | 3,640.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 22.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2573.501 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2573.503 | SILT FENCE; TYPE HI | LIN FT | 355.00 |
2575.504 | RAPID STABILIZATION METHOD 4 | SQ YD | 1,489.00 |
2580.503 | INTERIM PAVEMENT MARKING | LIN FT | 56,901.00 |
2582.503 | 24" SOLID LINE PREF TAPE GR IN | LIN FT | 123.00 |
2582.503 | 4" BROKEN LINE MULTI COMP | LIN FT | 1,418.00 |
2582.503 | 4" DBLE SOLID LINE MULTI COMP | LIN FT | 6,217.00 |
2582.503 | 4" SOLID LINE MULTI COMP | LIN FT | 5,115.00 |
2582.503 | 6" SOLID LINE MULTI COMP | LIN FT | 26,935.00 |
2582.518 | PAVT MSSG PREF TAPE GR IN | SQ FT | 49.02 |