Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2104.503 | REMOVE PIPE CULVERTS | LIN FT | 94.00 |
2104.503 | SAWING BITUMINOUS PAVEMENT | LIN FT | 206.00 |
2104.504 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 4,418.00 |
2104.504 | REMOVE CONCRETE PAVEMENT | SQ YD | 39.00 |
2118.509 | AGGREGATE SURFACING CLASS 5 | TON | 526.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 5.00 |
2123.510 | 12 CU YD TRUCK | HOUR | 5.00 |
2123.510 | 4.0 CU YD FRONT END LOADER | HOUR | 5.00 |
2123.510 | 8 TON STEEL-WHEELED ROLLER | HOUR | 14.00 |
2123.510 | MOTOR GRADER | HOUR | 14.00 |
2130.523 | WATER | M GALLON | 15.00 |
2211.507 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 34.00 |
2211.509 | AGGREGATE BASE CLASS 5 | TON | 971.00 |
2232.504 | MILL BITUMINOUS SURFACE (6.0") | SQ YD | 2,688.00 |
2357.506 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 774.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (3;C) | TON | 2,302.00 |
2401.507 | STRUCTURE EXCAVATION CLASS E | CU YD | 170.00 |
2451.507 | GRANULAR BEDDING (CV) | CU YD | 58.00 |
2501.502 | 22" SPAN RC PIPE-ARCH APRON | EACH | 2.00 |
2501.502 | 24" RC PIPE APRON | EACH | 2.00 |
2501.503 | 22" SPAN RC PIPE-ARCH CULV CL IIA | LIN FT | 36.00 |
2501.503 | 24" RC PIPE CULVERT DES 3006 | LIN FT | 40.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 7.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2573.503 | SEDIMENT CONTROL LOG TYPE STRAW | LIN FT | 153.00 |
2575.504 | RAPID STABILIZATION METHOD 4 | SQ YD | 97.00 |
2582.503 | 4" DBLE SOLID LINE MULTI COMP | LIN FT | 2,609.00 |
2582.503 | 6" SOLID LINE MULTI COMP | LIN FT | 5,116.00 |