Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 0.38 |
2021.501 | MOBILIZATION | LUMP SUM | 0.62 |
2031.501 | FIELD OFFICE TYPE D | EACH | 1.00 |
2101.501 | CLEARING & GRUBBING | LUMP SUM | 1.00 |
2104.503 | REMOVE BARBED WIRE FENCE | LIN FT | 240.00 |
2105.601 | DEWATERING | LUMP SUM | 1.00 |
2105.601 | TEMPORARY STREAM DIVERSION SYSTEM | LUMP SUM | 1.00 |
2105.604 | GEOTEXTILE FABRIC TYPE VI | SQ YD | 1,214.00 |
2105.607 | SELECT GRANULAR EMBANKMENT (CV) | CU YD | 1,449.00 |
2106.507 | EXCAVATION - COMMON | CU YD | 286.00 |
2106.507 | GRANULAR EMBANKMENT (CV) | CU YD | 597.00 |
2118.607 | AGGREGATE SURFACING (CV) CLASS 5 | CU YD | 786.00 |
2357.606 | BITUMINOUS MATERIAL FOR SHOULDER TACK | GALLON | 66.00 |
2412.502 | 12X9 PRECAST CONCRETE BOX CULV END SECT | EACH | 2.00 |
2412.503 | 12X9 PRECAST CONCRETE BOX CULVERT | LIN FT | 56.00 |
2442.501 | REMOVE EXISTING BRIDGE | LUMP SUM | 1.00 |
2451.507 | COARSE AGGREGATE BEDDING (CV) | CU YD | 160.00 |
2501.502 | 66 SPAN CAS PIPE-ARCH APRON | EACH | 4.00 |
2501.502 | INSTALL CULVERT MARKER | EACH | 4.00 |
2501.503 | 66 SPAN CAS PIPE-ARCH CULVERT | LIN FT | 118.00 |
2501.507 | CULVERT EXCAVATION CLASS U | CU YD | 1,653.00 |
2511.507 | RANDOM RIPRAP CLASS III | CU YD | 34.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 0.38 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 0.62 |
2573.501 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2573.503 | SILT FENCE; TYPE HI | LIN FT | 1,305.00 |
2574.507 | COMMON TOPSOIL BORROW | CU YD | 289.00 |
2574.508 | FERTILIZER TYPE 3 | POUND | 238.00 |
2575.504 | EROSION CONTROL BLANKETS CATEGORY 3N | SQ YD | 3,582.00 |
2575.505 | SEEDING | ACRE | 0.68 |
2575.508 | SEED MIXTURE 25-141 | POUND | 40.00 |
2575.523 | RAPID STABILIZATION METHOD 3 | M GALLON | 8.20 |