Number | Item | Units | Quantity |
---|
2016.601 | QUALITY MANAGEMENT | LUMP SUM | 1.00 |
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 725.00 |
2104.504 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 2,831.00 |
2118.509 | AGGREGATE SURFACING CLASS 5 | TON | 5,749.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 28.00 |
2123.510 | 8 TON STEEL-WHEELED ROLLER | HOUR | 101.00 |
2123.510 | MOTOR GRADER | HOUR | 101.00 |
2130.523 | WATER | M GALLON | 336.00 |
2131.506 | CALCIUM CHLORIDE SOLUTION | GALLON | 17,161.00 |
2211.509 | AGGREGATE BASE CLASS 5 | TON | 4,101.00 |
2211.604 | AGGREGATE BASE STABILIZATION | SQ YD | 116,556.00 |
2215.504 | FULL DEPTH RECLAMATION | SQ YD | 116,556.00 |
2221.509 | SHOULDER BASE AGGREGATE CLASS 5 | TON | 1,994.00 |
2232.504 | MILL BITUMINOUS SURFACE (2.0") | SQ YD | 97,392.00 |
2232.603 | MILLED RUMBLE STRIPS-INTERMITTENT | LIN FT | 19,561.00 |
2357.506 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 4,344.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIX (2;C) | TON | 10,391.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2;C) | TON | 12,477.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 8.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2580.503 | INTERIM PAVEMENT MARKING | LIN FT | 61,032.00 |
2582.503 | 24" SOLID LINE PREF TAPE GR IN | LIN FT | 176.00 |
2582.503 | 4" BROKEN LINE MULTI COMP | LIN FT | 4,740.00 |
2582.503 | 4" DBLE SOLID LINE MULTI COMP | LIN FT | 6,321.00 |
2582.503 | 4" DOTTED LINE MULTI COMP | LIN FT | 400.00 |
2582.503 | 4" SOLID LINE MULTI COMP | LIN FT | 13,134.00 |
2582.503 | 6" SOLID LINE MULTI COMP | LIN FT | 58,666.00 |