Minnesota County Engineers Association City Engineers Association of Minnesota Minnesota Department of Transportation
Home | Advanced Search | FAQ | Bid Calendar | Privacy Policy |
rss feed icon rss feed icon

Project Number:
SAP 008-629-023
Contract Number:
1-2019
Other Project Numbers:
SAP 008-629-023
Project Description:
CSAH 29 Concrete Overlay
Construction Location:
City or Township:
Bid Opening:
12/05/2018 10:00 AM
Expected Award Date:
12/11/2018
Project Start Date:
06/03/2019
Construction Start Date:
06/03/2019
Construction End Date:
09/30/2019
Work Type:
Concrete
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
*COUNTY PROJECTS*
BIDS CLOSE December 5, 2018
BROWN COUNTY, MN
NOTICE TO CONTRACTORS-
Notice is hereby given that the Board of Commissioners, Brown County; New Ulm, MN will accept sealed bids, at the Office of the County Administrator, in the Brown County Courthouse, New Ulm, MN. until 10:00 a.m. on the 5th day of December, 2018, for the following project(s):
• S.A.P. 008-629-023 Concrete Overlay and Aggregate Shoulders on CSAH 29 located between TH 4 and CSAH 12.

Major quantities include: 1 L.S. Construction Surveying; 1 L.S. Mobilization; 22,000 Tons Aggregate Shoulder Class 1; 7350 S.Y. Full Depth Reclamation; 168,300 S.Y. Mill Bituminous Surface; 47,800 L.F. Milled Rumble Strips (Concrete); 188,000 S.Y. Place Concrete Pavement 6 Inches; 35,500 C.Y. Structural Concrete; 3000 Ton Wearing Course Mixture; 1 L.S. Traffic Control; and 128,100 L.F. 4 Inch Striping (Epoxy) Ground In. Plans and proposal price is $30.00 nonrefundable.
Plan, proposal and specifications can be examined and obtained from the Brown County Highway Department, 1901 N. Jefferson St., New Ulm, MN. 56073, ph#507-233-5700. A check, draft or money order in the amount listed above, and payable to the Brown County Treasurer must accompany requests for plans and proposals.
A bidder’s bond or a certified check payable to the Treasurer of Brown County in the amount of at least 5% of the total amount bid must be included.


Brown County reserves the right to reject any or all bids.
Dated: October 23, 2018
Chuck Enter, County Administrator
Brown County, MN
Project Major Items:
NumberItemUnitsQuantity
2011.601CONSTRUCTION SURVEYINGLS1.00
2021.501MOBILIZATIONLS1.00
2118.509AGGREGATE SURFACING CLASS 1TON22,000.00
2215.504FULL DEPTH RECLAMATIONS Y7,350.00
2232.504MILL BITUMINOUS SURFACES Y168,300.00
2232.603MILLED RUMBLE STRIPS (CONCRETE)L F47,800.00
2301.504PLACE CONCRETE PAVEMENT 6"S Y188,000.00
2301.507STRUCTURAL CONCRETEC Y35,500.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;B)TON3,000.00
2563.601TRAFFIC CONTROLLS1.00
2582.5034" BROKEN LINE WHITE PAINT (EPOXY) GR INL F340.00
2582.5034" BROKEN LINE YELLOW PAINT (EPOXY) GR INL F10,860.00
2582.5034" SOLID LINE WHITE PAINT (EPOXY) GR INL F107,300.00
2582.5034" SOLID LINE YELLOW PAINT (EPOXY) GR INL F9,600.00
Project Owner:

Stevens, Wayne
1901 North Jefferson St.
New Ulm, MN   56073
(507) 233-5700
(507) 354-6857
wayne.stevens@co.brown.mn.us
Project Engineer:

Stevens, Wayne
1901 North Jefferson St.
New Ulm, MN   56073
(507) 233-5700
(507) 354-6857
wayne.stevens@co.brown.mn.us