- Project Number:
- SP 069-070-028
- Contract Number:
- Other Project Numbers:
- CP 0016-259424 TST SP 069-070-028
- Project Description:
- SP 69-070-028, CP 0016-259424 - Intersection Conflict Warning System
- Construction Location:
- City or Township:
- Bid Opening:
- 08/30/2018 10:00 AM
- Expected Award Date:
- 09/11/2018
- Project Start Date:
- 10/01/2018
- Construction Start Date:
- 10/01/2018
- Construction End Date:
- 12/28/2018
- Work Type:
- Traffic Control
- Project Type:
- Road and Street
- Highest Funding Level:
- Federal
- DBE Project:
- No
CP 0016-259424, SP 069-070-028, HSIP 6918(266)
Intersection Conflict Warning System
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2545.541 | SERVICE CABINET -TYPE B (MOD) | EACH | 1.00 |
2545.542 | 30' WOOD POLE, CLASS ll | EACH | 5.00 |
2545.602 | INSTALL WOOD POLE | EACH | 5.00 |
2550.523 | 2" NON-METALLIC CONDUIT | LIN FT | 115.00 |
2550.532 | POWER CABLE 1 CONDUCTOR NO 6 | LIN FT | 371.00 |
2550.532 | SIGNAL CONTROL CABLE 3 COND NO 14 | LIN FT | 341.00 |
2550.552 | FLASHER SIGNAL | EACH | 6.00 |
2550.572 | SERVICE EQUIPMENT | EACH | 1.00 |
2550.602 | DETECTION SYSTEM | EACH | 14.00 |
2550.603 | 2" BORED CONDUIT | LIN FT | 172.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2564.618 | SIGN TYPE C | SQ FT | 74.00 |
2565.602 | HANDHOLE | EACH | 3.00 |
2565.602 | PEDESTAL FOUNDATION | EACH | 4.00 |
2565.602 | PEDESTAL POLE & BASE | EACH | 4.00 |
2575.555 | TURF ESTABLISHMENT | LUMP SUM | 1.00 |