Project Number:
SAP 069-673-005
Contract Number:
244396
Other Project Numbers:
CP 0073-276911 SAP 069-673-005
Project Description:
CP 0073-276911 - Reclaim & Overlay
Construction Location:
City or Township:
Bid Opening:
03/08/2018 10:00 AM
Expected Award Date:
03/27/2018
Project Start Date:
06/25/2018
Construction Start Date:
06/25/2018
Construction End Date:
08/09/2019
Work Type:
Bituminous
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
CP 0003-244396 (Low), SAP 069-603-015; CP 0000-375664 (Tied), SAP 009-673-001; CP 0073-276911 (Tied), SAP 069-673-005; CP 0261-378873 (Tied); CP 0894-277234 (Tied)

Full Depth Reclamation, Plant Mixed Bituminous Surface, Aggregate Shouldering, Bituminous Seal Coat, Mill Bituminous Surface, Base Stabilization (Base One) and Culvert Replacement
Project Major Items:
NumberItemUnitsQuantity
2021.501MOBILIZATIONLUMP SUM0.92
2021.601MOBILIZATION, SEAL COATLUMP SUM0.90
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD4,713.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT335.00
2118.501AGGREGATE SURFACING CLASS 5TON600.00
2123.503MOTOR GRADERHOUR40.00
2123.5070.5 CU YD SHOVELHOUR10.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR40.00
2130.501WATERM GALLON40.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON2,074.00
2211.501AGGREGATE BASE CLASS 5TON590.00
2215.501FULL DEPTH RECLAMATIONSQ YD23,845.00
2215.604BASE STABILIZATION (BASE ONE)SQ YD20,771.00
2221.501SHOULDER BASE AGGREGATE CLASS 5TON1,083.00
2232.501MILL BITUMINOUS SURFACE (5.0")SQ YD13,090.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON3,190.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON5,202.00
2356.506BITUMINOUS SEAL COATSQ YD15,764.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON2,866.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON790.00
2360.501TYPE SP 9.5 WEARING COURSE MIX (3;C)TON6,524.00
2360.502TYPE SP 12.5 NON WEAR COURSE MIX (3;C)TON2,409.00
2360.505TYPE SP 9.5 BIT MIXTURE FOR ENTRANCES (3,C)TON102.00
2540.602MAIL BOX SUPPORTEACH10.00
2563.601TRAFFIC CONTROLLUMP SUM0.92
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM0.90
2563.601WORK ZONE SPEED LIMITLUMP SUM0.92
2580.603INTERIM PAVEMENT MARKINGLIN FT16,936.00
2580.603INTERIM PAVEMENT MARKINGLIN FT30,457.00
2582.50224" SOLID LINE EPOXYLIN FT22.00
2582.50224" SOLID LINE PAINTLIN FT22.00
2582.5024" BROKEN LINE EPOXYLIN FT670.00
2582.5024" BROKEN LINE PAINTLIN FT670.00
2582.5024" DBLE SOLID LINE EPOXYLIN FT3,000.00
2582.5024" DBLE SOLID LINE PAINTLIN FT3,000.00
2582.5024" SOLID LINE EPOXYLIN FT1,798.00
2582.5024" SOLID LINE PAINTLIN FT1,798.00
2582.5026" SOLID LINE EPOXYLIN FT12,280.00
2582.5026" SOLID LINE PAINTLIN FT12,280.00
Project Owner:

St. Louis Co., Bid Information
4787 Midway Road
Duluth, MN   55811
(218) 625-3830
(218) 625-3888
JohnsonR2@stlouiscountymn.gov
Project Engineer:

Krasaway, Stephen
4787 Midway Road
Duluth, MN   55811
(218) 625-3830
(218) 625-3888
krasaways@stlouiscountymn.gov