- Project Number:
- SAP 009-673-001
- Contract Number:
- 244396
- Other Project Numbers:
- CP 0000-375664 SAP 009-673-001
- Project Description:
- CP 0000-375664 - Bituminous Reclamation
- Construction Location:
- City or Township:
- Bid Opening:
- 03/08/2018 10:00 AM
- Expected Award Date:
- 03/27/2018
- Project Start Date:
- 06/25/2018
- Construction Start Date:
- 06/25/2018
- Construction End Date:
- 08/09/2019
- Work Type:
- Bituminous
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
CP 0003-244396 (Low), SAP 069-603-015; CP 0000-375664 (Tied), SAP 009-673-001; CP 0073-276911 (Tied), SAP 069-673-005; CP 0261-378873 (Tied); CP 0894-277234 (Tied)
Full Depth Reclamation, Plant Mixed Bituminous Surface, Aggregate Shouldering, Bituminous Seal Coat, Mill Bituminous Surface, Base Stabilization (Base One) and Culvert Replacement
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 0.08 |
2021.601 | MOBILIZATION, SEAL COAT | LUMP SUM | 0.10 |
2104.505 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 344.00 |
2104.513 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 117.00 |
2118.501 | AGGREGATE SURFACING CLASS 5 | TON | 85.00 |
2123.503 | MOTOR GRADER | HOUR | 5.00 |
2123.507 | 0.5 CU YD SHOVEL | HOUR | 10.00 |
2123.525 | 8 TON STEEL-WHEELED ROLLER | HOUR | 5.00 |
2130.501 | WATER | M GALLON | 5.00 |
2131.502 | CALCIUM CHLORIDE SOLUTION | GALLON | 206.00 |
2211.501 | AGGREGATE BASE CLASS 5 | TON | 59.00 |
2215.501 | FULL DEPTH RECLAMATION | SQ YD | 2,338.00 |
2215.604 | BASE STABILIZATION (BASE ONE) | SQ YD | 1,788.00 |
2221.501 | SHOULDER BASE AGGREGATE CLASS 5 | TON | 90.00 |
2355.502 | BITUMINOUS MATERIAL FOR FOG SEAL | GALLON | 289.00 |
2356.505 | BITUMINOUS MATERIAL FOR SEAL COAT | GALLON | 587.00 |
2356.506 | BITUMINOUS SEAL COAT | SQ YD | 1,778.00 |
2357.502 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 192.00 |
2357.606 | BITUMINOUS MATERIAL FOR SHOULDER TACK | GALLON | 100.00 |
2360.501 | TYPE SP 9.5 WEARING COURSE MIX (3;C) | TON | 580.00 |
2360.502 | TYPE SP 12.5 NON WEAR COURSE MIX (3;C) | TON | 228.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 1.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 0.08 |
2563.601 | TRAFFIC CONTROL, SEAL COAT | LUMP SUM | 0.10 |
2563.601 | WORK ZONE SPEED LIMIT | LUMP SUM | 0.08 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 2,360.00 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 3,540.00 |
2582.502 | 24" SOLID LINE EPOXY | LIN FT | 25.00 |
2582.502 | 24" SOLID LINE PAINT | LIN FT | 25.00 |
2582.502 | 4" DBLE SOLID LINE EPOXY | LIN FT | 590.00 |
2582.502 | 4" DBLE SOLID LINE PAINT | LIN FT | 590.00 |
2582.502 | 6" SOLID LINE EPOXY | LIN FT | 1,163.00 |
2582.502 | 6" SOLID LINE PAINT | LIN FT | 1,163.00 |