- Project Number:
- SAP 069-622-022
- Contract Number:
- 255874
- Other Project Numbers:
- CP 0022-153313 (Tied) SAP 069-622-022
- Project Description:
- CP 0022-153313 (Tied); SAP 069-622-022, CSAH 5 To TH 73- Mill & Bit. Overlay
- Construction Location:
- City or Township:
- Bid Opening:
- 02/22/2018 10:00 AM
- Expected Award Date:
- 03/06/2018
- Project Start Date:
- 06/04/2018
- Construction Start Date:
- 06/04/2018
- Construction End Date:
- 08/15/2018
- Work Type:
- Mill and Overlay
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
CP 0005-255874 (Low), SAP 069-605-047; CP 0022-9313 (Tied); CP 0022-153313 (Tied), SAP 069-622-022
Mill Bituminous Surface, Bituminous Patch Mixture, Plant Mixed Bituminous Surface, Bituminous Pavement Reclamation, Aggregate Base, Aggregate Surfacing, Bituminous Surfacing, Bituminous Seal Coat and Culvert Replacement
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2118.501 | AGGREGATE SURFACING CLASS 5 | TON | 1,208.00 |
2231.501 | BITUMINOUS PATCHING MIXTURE | TON | 1,389.00 |
2232.501 | MILL BITUMINOUS SURFACE (1.0") | SQ YD | 92,000.00 |
2357.502 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 11,040.00 |
2360.501 | TYPE SP 9.5 WEARING COURSE MIX (2;C) | TON | 5,819.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 19.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2563.601 | WORK ZONE SPEED LIMIT | LUMP SUM | 1.00 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 65,316.00 |
2582.502 | 24" SOLID LINE PREF TAPE GR IN | LIN FT | 62.00 |
2582.502 | 4" BROKEN LINE EPOXY | LIN FT | 6,690.00 |
2582.502 | 4" DBLE SOLID LINE EPOXY | LIN FT | 1,171.00 |
2582.502 | 4" SOLID LINE EPOXY | LIN FT | 12,740.00 |
2582.502 | 6" SOLID LINE EPOXY | LIN FT | 68,653.00 |