- Project Number:
- CP 0393-298690 (Tied)
- Contract Number:
- 340081
- Other Project Numbers:
- CP 0393-298690 (Tied)
- Project Description:
- CP 0393-298690 (Tied) - Culvert Replacement
- Construction Location:
- City or Township:
- Bid Opening:
- 01/11/2018 10:00 AM
- Expected Award Date:
- 02/06/2018
- Project Start Date:
- 07/30/2018
- Construction Start Date:
- 07/30/2018
- Construction End Date:
- 09/14/2018
- Work Type:
- Pipe and Culvert
- Project Type:
- Road and Street
- Highest Funding Level:
- Local
- DBE Project:
- No
CP 0097-340081 (Low), SAP 069-697-007; CP 0099-340082 (Tied), SAP 069-699-004; CP 0111-352326 (Tied), SAP 069-711-002; CP 0341-352327(Tied); CP 0393-298690(Tied)
Culvert Replacement, Grading, Reclamation, Aggregate Base, Plant Mixed Bituminous Patches
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2101.511 | CLEARING & GRUBBING | LUMP SUM | 1.00 |
2104.509 | REMOVE CONCRETE STRUCTURE | EACH | 1.00 |
2105.602 | TEMPORARY STREAM DIVERSION SYSTEM | EACH | 1.00 |
2105.604 | GEOTEXTILE FABRIC TYPE VI | SQ YD | 190.00 |
2211.503 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 50.00 |
2451.501 | STRUCTURE EXCAVATION CLASS E | CU YD | 431.00 |
2451.503 | GRANULAR BACKFILL (CV) | CU YD | 377.00 |
2451.515 | COARSE AGGREGATE BEDDING (CV) | CU YD | 50.00 |
2501.511 | 66" CAS PIPE CULVERT 10 GAUGE | LIN FT | 84.00 |
2501.515 | 66" CAS PIPE APRON | EACH | 4.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2573.502 | SILT FENCE, TYPE HI | LIN FT | 120.00 |
2573.550 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2575.572 | RAPID STABILIZATION METHOD 4 | SQ YD | 636.00 |